Posted in | News | Gold | Copper | Silver

Nautilus Minerals Announces Commencement of Auxiliary Cutter Assembly at SMD Facility

Nautilus Minerals Inc. (the "Company" or "Nautilus") announces that the assembly of its third and final Seafloor Production Tool ("SPT"), the Auxiliary Cutter ("AC"), has this week commenced at Soil Machine Dynamics' ("SMD") facility at Newcastle upon Tyne, UK.

Nautilus' CEO, Mike Johnston said "we are pleased that the assembly of the AC, the third and final of the three SPTs has now commenced, with the arrival of the chassis at the SMD facility. The next milestone for the SPTs will be the commencement of Factory Acceptance Testing on the already assembled Bulk Cutter ("BC"). We look forward to reporting on this progress next month".

The AC will weigh in at 250 tonnes when fully assembled. The AC is a preparatory machine that deals with rough terrain and creates benches for the other SPTs to work. It will operate on tracks with spud assistance and has a boom mounted cutting head for flexibility.

Subsea vehicle designer and manufacturer, SMD of Newcastle upon Tyne, UK, is the company responsible for building the SPTs for Nautilus.

How they will work:

The excavation and collection of mineralised material has been split into three individual tasks, which will each be carried out by a different SPT. The AC is designed as the pioneering tool which prepares the rugged seabed for the more powerful BC. These two tools gather the excavated material; the other, the Collecting Machine, will collect the cut material by drawing it in as seawater slurry with internal pumps and pushing it through a flexible pipe to the subsea pump and on to the Production Support Vessel via the Riser and Lift System.

Links:

An animation of the seafloor production system and a video showing the assembly of the Bulk Cutter can be viewed on the Company's website: https://dsmf.im/

Assembly of Bulk Cutter completed: https://dsmf.im/

Collecting Machine assembly commences: https://dsmf.im/

Auxiliary Cutter assembly picture: https://dsmf.im/

For more information please refer to www.nautilusminerals.com.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Deep Sea Mining Finance. (2022, July 12). Nautilus Minerals Announces Commencement of Auxiliary Cutter Assembly at SMD Facility. AZoMining. Retrieved on November 21, 2024 from https://www.azomining.com/News.aspx?newsID=10061.

  • MLA

    Deep Sea Mining Finance. "Nautilus Minerals Announces Commencement of Auxiliary Cutter Assembly at SMD Facility". AZoMining. 21 November 2024. <https://www.azomining.com/News.aspx?newsID=10061>.

  • Chicago

    Deep Sea Mining Finance. "Nautilus Minerals Announces Commencement of Auxiliary Cutter Assembly at SMD Facility". AZoMining. https://www.azomining.com/News.aspx?newsID=10061. (accessed November 21, 2024).

  • Harvard

    Deep Sea Mining Finance. 2022. Nautilus Minerals Announces Commencement of Auxiliary Cutter Assembly at SMD Facility. AZoMining, viewed 21 November 2024, https://www.azomining.com/News.aspx?newsID=10061.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.