Posted in | News | Gold | Discoveries

Hunt Mining’s Latest Drilling on La Josefina Project Confirms High-Grade Gold Mineralization

Hunt Mining Corp. (the "Corporation" or "Hunt") is pleased to announce drill core assay results for two separate targets drilled in the 2014 campaign on the La Josefina Project located in Santa Cruz, Argentina. Hunt conducted a shallow Diamond drilling campaign, not more than 50 meters in depth, including 12 holes totaling 651 meters in length completed on the Maria Belen target and 15 holes totaling 957 meters were drilled on the Sinter target.

The results of this latest drilling continue to confirm high-grade gold mineralization and will be instrumental in the Corporation's ongoing resource expansion efforts and near-term development decisions.

At the Sinter target, all 15 drill holes intersected mineralization. More than half the drill holes intersected one or more intervals containing more than 1.0 g/t Au over true widths ranging from 2.0 to 6.8 meters. Select assay results from the Sinter target include:

Hole # SSI-D14-472:

  • 6.8 meters (22.8 feet) true width of 4.28 (grams/tonne) g/t gold, including:
    • 0.8 meters true width of 20.6 g/t gold

Hole # SSI-D14-463:

  • 2.0 meters true width of 14.9 g/t gold

Hole # SSI-D14-469:

  • 2.4 meters true width of 4.8 g/t gold, including:
    • 1.3 meters true width of 8.38 g/t gold

Significant mineralized intercepts in those holes not cited above (SSI-D14-458 through 471) include grades ranging from 0.3 to 4.1 g/t Au. A table with all 2014 Sinter drill results can be viewed at www.huntmining.com

At the Maria Belen target, 11 of the 12 drill holes intersected mineralization. Five of these holes intersected one or two intervals containing more than 1.0 g/t Au over true widths ranging from 1.4 to 9.5 meters. Select assay results from the Maria Belen target include:

Hole # SC-D14-448:

  • 4.6 meters (15.1 feet) true width of 6.1 (grams/tonne) g/t gold, including:
    • 0.8 meters true width of 43.5 g/t gold

Hole # SC-D14-450:

  • 3.8 meters true width of 4.3 g/t gold, including:
    • 1.4 meters true width of 11.5 g/t gold

Hole # SC-D14-447:

  • 1.6 meters true width of 5.4 g/t gold

Hole # SC-D14-453:

  • 1.6 meters true width of 7.7 g/t gold, including:
    • 1.0 meters true width of 11.6 g/t gold

Mineralization intersected in those holes not cited above (SC-D14-446 through 457) includes gold grades ranging from 0.2 to 4.2 g/t Au. A table with all 2014 Maria Belen drill results can be viewed at www.huntmining.com.

Notes:

  • True widths reported above are estimated at 100% of intercept widths based on surface sampling, flat lying stratigraphic control of mineralization, vertical orientation of drill holes, and cross-section comparisons.
  • All drilling has been conducted in accordance with standard industry practices.
  • All samples were prepared and assayed by Alex Stewart Laboratories in Mendoza, Argentina.
  • An analysis of the Corporation's QA/QC practices are reviewed in detail in the Corporation's current Technical Report in respect of the La Josefina Project, which is available at www.sedar.com

Mel Klohn, Senior Technical Advisor for the Corporation, is the Qualified Person under NI 43-101 who has approved the technical content of this new release.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Patagonia Gold Corp.. (2019, February 17). Hunt Mining’s Latest Drilling on La Josefina Project Confirms High-Grade Gold Mineralization. AZoMining. Retrieved on November 24, 2024 from https://www.azomining.com/News.aspx?newsID=10461.

  • MLA

    Patagonia Gold Corp.. "Hunt Mining’s Latest Drilling on La Josefina Project Confirms High-Grade Gold Mineralization". AZoMining. 24 November 2024. <https://www.azomining.com/News.aspx?newsID=10461>.

  • Chicago

    Patagonia Gold Corp.. "Hunt Mining’s Latest Drilling on La Josefina Project Confirms High-Grade Gold Mineralization". AZoMining. https://www.azomining.com/News.aspx?newsID=10461. (accessed November 24, 2024).

  • Harvard

    Patagonia Gold Corp.. 2019. Hunt Mining’s Latest Drilling on La Josefina Project Confirms High-Grade Gold Mineralization. AZoMining, viewed 24 November 2024, https://www.azomining.com/News.aspx?newsID=10461.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.