Posted in | News | Gold

Kilo Goldmines Reports Partial Drilling Results from Somituri Project

Kilo Goldmines Ltd. (TSX VENTURE:KGL)(FRANKFURT:02K) has announced partial results from diamond drill hole fifteen on the Company's Somituri Project in north-eastern Democratic Republic of Congo.

Somituri - Adumbi Prospect Drilling

Diamond drill-hole SADD0015 was collared on drill section 19835E to intersect the gold bearing structure vertically above the previously reported gold bearing zone intersected in drill hole SADD0004 on drill section 19850E (see PR dated July 11, 2010). The entire 169.70 metre long SADD0015 drill hole intersected predominantly oxidized banded iron formation and chert.

"The vertical continuity of the gold zone has been confirmed by this drill hole, and particularly encouraging are the higher grade gold values within the oxide zone. The upper holes currently being drilled will help further define the oxide zone." stated Peter Hooper, Executive Chairman.

Intersected by diamond drill hole SADD0015 is the chemical metasedimentary rocks characterized predominantly by intervals of chert and banded haematite iron formation (BIF) with lesser intervals of chert banded with black shale and several minor intervals of black shale. The drill hole terminated within the mineralized main zone that includes the main zone quartz vein. The entire drill hole intersected oxides, weathered from sulphides. Neither the tuffaceous metasediments or greywacke nor the tuffaceous metasedimentary rocks that flank the chemical metasedimentary unit on the southwestern side and the northeastern side respectively were intersected.

Diamond drill hole SADD0015 was collared 15 metres northwest of the section line on which drill hole SADD0004 was collared. Drill hole SADD0015 was drilled on a magnetic azimuth of 220 degrees and at an inclination of -50 degrees and due to technical difficulties the hole ended at 169.70 metres. The true thicknesses of the gold bearing intervals are estimated at approximately 70 percent of the drill hole intersection intervals. A 0.38 g/t gold cut-off was used to calculate the intersections; no internal dilution is present within the 21.00 metres grading 5.01 g/t gold. The 5.40 metre interval grading 0.61 g/t gold contains 2.00 metres of internal dilution.

About the Somituri Project

The company has completed 20 diamond drill holes, abandoned 6 and 2 are currently in progress; a total of 5,930 metres have been drilled on the Adumbi Prospect. Records from the colonial era, unverified by the Company, indicate that during the 1940s until its closure in 1958 the combined production from the Adumbi and Bagbaie mines totaled about 200,000 ounces of gold; the Adumbi gold was hosted in quartz vein ore that averaged 11 g/t gold.

In addition, five drill holes have been completed on the past producing Kitenge gold mine, three holes have been completed on the former Manzako gold mine and one drill hole has been completed on the Monde Arabe target, which may be the northwest strike extension of the Kitenge gold bearing structure. According to historical records, unverified by the Company, the Kitenge and Manzako mines produced about 100,000 ounces of gold prior to about 1942. In addition, trenching and deep soil sampling is being carried out.

QC and Analytical Procedures

Quality control of analytical results is monitored by the company with the insertion of commercial standards and blanks in every batch of samples submitted for analysis. For additional details the reader is referred to Kilo's previously announced (see May 4, 2010 press release) quality control and analytical procedures.

Qualified Person

The drilling program disclosed in this press release was planned and supervised by the Company's geological consultant Stanley Robinson. Stanley Robinson, M.Sc., P.Geo is also the 'qualified person' (as that term is defined under National Instrument 43-101) of the Company who has reviewed the scientific and technical information contained in this release.

Source:

Kilo Goldmines Ltd.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    KGL Resources Limited. (2019, February 18). Kilo Goldmines Reports Partial Drilling Results from Somituri Project. AZoMining. Retrieved on November 21, 2024 from https://www.azomining.com/News.aspx?newsID=1603.

  • MLA

    KGL Resources Limited. "Kilo Goldmines Reports Partial Drilling Results from Somituri Project". AZoMining. 21 November 2024. <https://www.azomining.com/News.aspx?newsID=1603>.

  • Chicago

    KGL Resources Limited. "Kilo Goldmines Reports Partial Drilling Results from Somituri Project". AZoMining. https://www.azomining.com/News.aspx?newsID=1603. (accessed November 21, 2024).

  • Harvard

    KGL Resources Limited. 2019. Kilo Goldmines Reports Partial Drilling Results from Somituri Project. AZoMining, viewed 21 November 2024, https://www.azomining.com/News.aspx?newsID=1603.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.