Posted in | News | Gold | Mining Business

Roxgold Reports 26.9 GPT Over 4.8 Metres at Boussoura as Drill Program Continues to Expand Additional Fofora Vein Sets


Roxgold Inc. (“Roxgold” or the “Company”) is pleased to announce new exploration drilling results from the Company’s Boussoura Project, located in southern Burkina Faso.

Boussoura Project, Burkina Faso:

Highlights from scout Reverse Circulation (“RC”) and Diamond Core (“RD”) drilling

Fofora

  • 4.8 metres (“m”) at 26.9 grams per tonne gold (“g/t Au”) in drill hole BSR-20-RD-FFR-040 from 79.5 m including
    • 0.8 m at 147 g/t Au from 79.5 m;
      and separate intervals of
    • 1.9 m at 7.3 g/t Au from 42.7 m;
    • 6.0 m at 2.5 g/t Au from 57.5 m; and
    • 9 m at 2.7 g/t Au from 182 m
  • 9 m at 10.7 g/t Au in drill hole BSR-20-RC-FFR-063 from 71 m including
    • 1 m at 84.1 g/t Au from 77 m
  • 12 m at 5.7 g/t Au in drill hole BSR-20-RC-FFR-052 from 74 m including
    • 2 m at 33.4 g/t Au from 74 m
  • 22 m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-062 from 40 m including
    • 1 m at 35.4 g/t Au from 45 m
  • 6.7 m at 6.4 g/t Au in drill hole BSR-19-DD-FFR-011 from 244.3 m including
    • 0.4 m at 94 g/t Au from 249.6 m
  • 14 m at 3.0 g/t Au in drill hole BSR-20-RC-FFR-070 from 2 m including
    • 2 m at 13.5 g/t Au from 8 m
  • 18 m at 0.9 g/t Au from 54 m and 6 m at 4.1 g/t from 92 m in drill hole BSR-20-RC-FFR-051
  • 30 m at 1.3 g/t Au from 0 m and 2 m at 11.4 g/t from 76 m in drill hole BSR-20-RC-FFR-053A
  • 8 m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-060 from 16 m

“The exploration success at the Boussoura Project continues to build our confidence in the potential for the project to become Roxgold’s third high value asset,” stated John Dorward, President and CEO. “We announced the discovery of Boussoura in February of this year and have drilled over 70 holes with consistent assay returns demonstrating broad intersections of mineralization with lower grade halos surrounding higher grade quartz veining at Fofora and high grade veins at Galgouli. We are excited by the potential scale of this project with multiple additional veins with active artisanal workings yet to be tested and numerous targets identified on our exploration permit with similar geochemistry and geophysical anomalies. Going forward, the focus will be on drilling the additional 5 vein sets identified at Fofora, testing targets near Galgouli and conducting an aircore drill program to prioritise the regional targets that have demonstrated high prospectivity from recent geochemical results.”

Paul Weedon, Vice President Exploration commented “We have now identified over 9 mineralized vein sets over 4 vein corridors across only a third of the 9 km2 active area at Fofora. The results today further highlight the potential we see at Boussoura, with high grade results such as 4.8 m at 26.9 g/t Au from BSR-20-RD-FFR-040 and 9 m at 10.7 g/t Au from BSR-20-RC-FFR-063 underpinning the high grade nature of the veining we see there.

“In addition, these results include a re-entry and extension of hole BSR-19-DD-FFR-011 drilled at the main Fofora vein last year, which returned 6.7 m at 6.4 g/t Au, including 0.4 m at 94 g/t Au from 249.6 m, emphasising the depth continuity of the veins and is one of the deepest intersections to date.”

Boussoura Project – Burkina Faso

The Boussoura Project is situated in the southern portion of the Houndé Greenstone Belt which is host to several large-scale operating gold mines, including Roxgold’s Yaramoko Mine which is 190 km to the north as well as Endeavour Mining’s Houndé and Mana gold mines. The Boussoura Project is located approximately 10 kilometres north of the Côte d’Ivoire border (Figure 1).

 

 

Figure 1. Boussoura Project Location on Houndé Belt

The Boussoura tenement covers an area of over 250 square kilometres (“km2”) with an earn-in agreement in place over an additional 250 km2 of neighbouring permits. The primary targeted areas of the Boussoura Project are Fofora, in the north, and Galgouli, in the south. Fofora has seen a minor amount of exploration in the past, while Galgouli was a new discovery by Roxgold (refer to Company news release dated Feb 3, 2020).

Figure 2. Fofora and Galgouli

Fofora

At least 9 sets of shear zones and vein corridors have been identified to date within an active 9 square kilometre artisanal field in the Fofora area of the Boussoura Project (Figure 2). Drilling resumed at Fofora in early May, testing 5 new vein corridors within 2 kilometres to the west of the main Fofora Vein. Each of the 5 vein corridors were considered high priority targets, each having coincident artisanal workings, and geophysical and geochemical anomalies and consisting of a series of north to north-west striking shear zones with surface strike lengths of up to 1,000 m. These targets form part of the broader Fofora artisanal field and are very similar in appearance to the high grade Fofora main vein (Figure 3).

Mineralization is typically associated with a series of sheared felsic dykes, associated quartz veining and intense silica alteration and replacement, with a variable dip from steep westerly to ~70 degrees east with coarse gold commonly seen in samples. Two mineralization styles have now been recognized at Fofora, with very broad lower grade zones (typically 0.5-1.0 g/t) extending up to 60 m in width and interpreted as representing broad siliceous halos to much higher grade quartz veins (10 to >100 g/t intervals with high levels of coarse gold) over 1-4 m intervals.

There were 12 additional RC and RC with diamond tail holes completed at the Fofora Main vein, with a line of 5 holes successfully extending the strike an additional 150 m to the south. Results included 9 m at 10.7 g/t from BSR-20-RC-FFR-063 from 71 m, and the vein remains open along strike.

In addition, 5 holes successfully intersected an interpreted parallel subsidiary vein on the eastern margin of Fofora Main with results including 14 m at 3.0 g/t in BSR-20-RC-FFR-070 from 2 m, and 22m at 2.1 g/t from BSR-20-RC-FFR-062 from 40 m. A re-entry and extension of drill hole BSR-19-DD-FFR-011, targeting interpreted depth extensions, returned 6.7 m at 6.4 g/t from 244.3 m while drill hole BSR-20-RD-FFR-040 intersected several well mineralized intervals, the highlight of which was 4.8 m at 26.9 g/t Au from 79.5 m, including a 0.8 m interval of 147 g/t Au. These depth extensions and parallel structures remain open along strike and at depth.

Figure 3. Assay results from scout drill program at Fofora

Reconnaissance RC drilling tested vein targets up to 2 kilometres to the west of the main Fofora vein, with recent results including 12 m at 5.7 g/t from 74m in BSR-20-RC-FFR-052, 30 m at 1.3 g/t Au from 0 m in BSR-20-RC-FFR-053A which included 2 m at 10.0 g/t Au from 14 m and a separate interval of 2 m at 11.4 g/t Au from 76m, and 17m at 2.1 g/t Au from BSR-20-RC-FFR-079 from 41 m with these results increasing the extent of mineralization highlighted in the previous company release (refer to Company news release dated July 29, 2020).

Reconnaissance drilling is continuing to test targets a further 1 kilometre west and south with further work to test the balance of the 3 km by 3km artisanal field planned for Q4 this year, after the conclusion of the current rainy season.

Highlights from the most recent drilling at Fofora include:

Fofora Main Drilling

  • 4.8 m at 26.9 g/t Au in drill hole BSR-20-RD-FFR-040 from 79.5 m including
    • 0.8 m at 147 g/t Au from 79.5 m;
      and separate intervals of
    • 1.9 m at 7.3 g/t Au from 42.7 m;
    • 6.0 m at 2.5 g/t Au from 57.5 m;
    • 13.5 m at 1.3 g/t Au from 118 m; and
    • 9 m at 2.7 g/t Au from 182 m
  • 9 m at 10.7 g/t Au in drill hole BSR-20-RC-FFR-063 from 71 m including
    • 1m at 84.1 g/t Au from 77 m
  • 22 m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-062 from 40 m including
    • 1 m at 35.4 g/t Au from 45 m
  • 14 m at 3.0 g/t Au in drill hole BSR-20-RC-FFR-070 from 2 m including
    • 2 m at 13.5 g/t Au from 8 m
  • 19 m at 1.0 g/t Au in drill hole BSR-20-RC-FFR-065 from 77 m including
    • 1 m at 12.2 g/t Au from 92 m
  • 6.7 m at 6.4 g/t Au in drill hole BSR-19-DD-FFR-011 from 244.3 m including
    • 0.4 m at 94 g/t Au from 249.6 m

Fofora Scout Drilling

  • 12 m at 5.7 g/t Au in drill hole BSR-20-RC-FFR-052 from 74 m including
    • 2 m at 33.4 g/t Au from 74 m
  • 18 m at 0.9 g/t Au in drill hole BSR-20-RC-FFR-051 from 54 m; and
    • 6 m at 4.1 g/t Au from 92 m
  • 30 m at 1.3 g/t Au in drill hole BSR-20-RC-FFR-053A from  0 m including
    • 2 m at 10.0 g/t from 14 m;
      and a separate interval of
    •  2 m at 11.4 g/t Au from 76 m
  • 25 m at 0.7 g/t Au in drill hole BSR-20-RC-FFR-053 from 1 m
  • 8 m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-060 from 16 m
  • 6 m at 2.2 g/t Au in drill hole BSR-20-RC-FFR-058 from 72 m
  • 16 m at 1.0 g/t Au in drill hole BSR-20-RC-FFR-076 from 22 m
  • 17 m at 2.1 g/t Au in drill hole BSR-20-RC-FFR-079 from 41 m including
    • 1 m at 13.4 g/t Au from 46 m and
    • 1 m at 13.5 g/t Au from 48 m

Click here to view the full listing of drill results from the recent drilling programs at the Boussoura Project. All results are reported as down-hole intervals which represent approximately 70% of true width, except for FFR-047 which was drilled oblique to the interpreted dip of the mineralization, with true width assumed to be ~40% of reported downhole width.

Catalysts and Next Steps

Event

Timing

Updated Resource and Reserve Statement for the Yaramoko Mine Complex

Q4 2020

Ongoing infill, expansion and satellite target drilling program at Séguéla

Q4 2020

Drilling results from Boussoura

Q4 2020

Underground drilling program in 55 Zone at Yaramoko Mine Complex

Q4 2020

Feasibility Study for Séguéla

H1 2021

Séguéla construction decision

H1 202

 

Quality Assurance/Quality Control

All drilling data completed by Roxgold utilized the following procedures and methodologies. All drilling was carried out under the supervision of Roxgold personnel.

RC drilling used a 5.25 inch face sampling pneumatic hammer with samples collected into 60 litre plastic bags. Samples were kept dry by maintaining enough air pressure to exclude groundwater inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to diamond core tails. Aircore (“AC”) drilling was collected in one metre intervals and sampled in a similar fashion to RC methods. Once collected, RC and AC samples were riffle split through a three-tier splitter to yield a 12.5% representative sample for submission to the analytical laboratory. The residual 87.5% sample were stored at the drill site until assay results were received and validated. Coarse reject samples for all mineralized samples corresponding to significant intervals are retained and stored on-site at the Company controlled core yard.

DD drill holes were drilled with HQ sized diamond drill bits. The core was logged, marked up for sampling using standard lengths of one metre. Samples were then cut into equal halves using a diamond saw. One half of the core was left in the original core box and stored in a secure location at the Company core yard at Yaramoko. The other half was sampled, catalogued and placed into sealed bags and securely stored at the site until shipment.

All Boussoura RC, AC and DD core samples were shipped to ALS Laboratories laboratory in Ouagadougou for preparation. Samples were dried and crushed by the laboratory and a 250-gram split prepared from the coarse crushed material, prior to pulverization and preparation of a 200 g sample with routine gold analysis using a 50-gram charge and fire assay with an atomic absorption finish. Quality control procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, the laboratory inserted its own quality control samples.

Qualified Person

Paul Weedon, MAIG, Vice-President, Exploration for Roxgold Inc., a Qualified Person within the meaning of National Instrument 43-101, has reviewed and approved the scientific and technical disclosure contained in this news release, including the QA/QC, sampling, analytical and test data underlying this information. Mr. Weedon verified the information in the news release by reviewing the drill logs, geological interpretations and supporting analytical data. No limitations were imposed on Mr. Weedon’s verification process. For more information on the Company’s QA/QC and sampling procedures, please refer to the Company’s Annual Information Form dated December 31, 2019, available on the Company’s website at www.roxgold.com and on SEDAR at www.sedar.com.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.