AmeriLithium will start a planned 8-hole drill program at Paymaster Lithium brine project in Nevada, USA, on March 15, 2011. Drilling arrangements include the funds for the project's Reclamation Bond that has been deposited to meet the terms of BLM's instructions.
AmeriLithium's VP makes sure that the completion of all preliminary site setup has been done. GeoXplor, who has successfully planned and executed the AmeriLithium's two initial stages of exploration, is carrying out initial site set-up. Skytech Drilling of Arizona will arrive on March 14th to commence drilling of the first hole on March 15th.
Gravity and magnetic survey taken shows encouraging results and leads to the next steps. GeoXplor and Skytech will ensure efficient and effective execution of the drill program.
AmeriLithium will analyze areas of significant Lithium brine potential at three initially drilled holes, followed by the remaining five holes depending on the initial drilling results.
AmeriLithium will inspect and sample the stratigraphy and lithology of the sedimentary sequence, the nature and extent of the saturated zones and the concentration of Lithium and other constituents in the groundwater in the holes by penetrating the formations comprising the basin fill in Paymaster Canyon.