Nevada Copper has announced positive drilling results from the Pumpkin Hollow Property, Nevada. NC11-GT01, drill hole has reported assay results from the geotechnical drill campaign.
At present, a drill rig is finishing the geotechnical drilling for Definitive Feasibility Study, which is planned to be completed by June 30, 2011. After the company has completed the geotechnical drilling, this rig would connect two drill rigs, which presently drills 20,000m resource step-out and extension drilling. This program will analyze numerous open mineralization and potential targets.
The company has drilled NC11-GT01 slantingly to dip to gather geotechnical information along the lower parts of the E2 deposit. This hole successfully confirms the stability of high-grade mineralization, which intersects 1.84% copper, 0.28 grams gold and 8.3 grams silver over 415 feet, 149.9 feet, including 2.89% copper, 0.34 grams gold and 10.5 grams silver over 230.0 feet, 78.7 feet.
Nevada Copper has continued to develop the plus 2% copper zones in NC11-GT01, besides gathering geotechnical information in subversive progress areas of the E2 Deposit. The company will impact positively for forthcoming developing programs when the deposit is expanded in the lower portions for higher grade mineralization.