Posted in | News | Gold

Patriot Gold Updates on Phase I of Moss Mine Project Drilling Program

Patriot Gold Corp. has announced updated drill results from Phase I of the Moss Mine Project drilling program conducted by the firm's joint venture partner, Northern Vertex, Inc.

Assay results obtained in August from 16 drill holes at the 1,600-acre project in Arizona continue to provide additional evidence that the Moss gold project has consistent and reliable distribution of gold throughout the main stockwork vein zone.  Samples taken from intersections that ranged from 3.05 to 71.63 meters demonstrated an average of 3.20 gpt, with all but one intersection exceeding 1+ gpt and one hole (AR-76C) producing an impressive 8.38 gpt intersection in a 6.71 meter length.

In October, assay results were reported from the final 19 drill holes, completing Phase 1 infill drilling for the project.  Samples taken from intersections that ranged from 1.52 to 190.5 meters demonstrated an average of 1.45 gpt.

The next steps will involve combining data from the Phase 1 drill results with previously collected data to complete an independent National Instrument 43-101 Resource Calculation (NI 43-101) study to confirm the data's compliance with 43-101 standards. Scott Wilson Consulting Inc., a Colorado-based firm, is currently conducting the study. In addition to the NI 43-101 study, Schlumberger Water Services (SWS) is currently conducting an initial scoping level work plan for environmental permitting, hydrogeology and engineering services as part of the permitting process required for open pit mining at the Moss property. In keeping with the Company's objective to fast-track development of the Moss Gold-Silver Project, included in the work plan, Schlumberger will provide a detailed summary of the permit acquisition process costs and schedule for future mine development and budgeting purposes.

"We are very pleased and encouraged with current assay results," said Dr. Bob Thompson, Northern Vertex Chief Geologist. "Assays continue to consistently meet or surpass historical drill results where 20 to 50 meter intervals of 1+ gram gold were reported. The numerous 20+ meter intersections of 1.5 – 2.5 gpt values demonstrate the deposit has remarkably uniform gold distribution both along strike and down dip, while maintaining its strength to depth, creating the opportunity to mine at even greater depths than originally envisioned. We believe the Phase 1 program has provided excellent data to allow calculation of a 43-101 compliant resource."

"Since announcing our agreement with Northern Vertex in March 2011, we have obtained results from 59 completed drill holes at the Moss Mine Project site with all but three producing results that have met or surpassed our expectations," said Bob Coale, CEO of Patriot Gold. "Northern Vertex continues to aggressively pursue our joint objectives established for this program. The continued success of the Moss Mine Project is well aligned with our objective of building a strong portfolio of mineral assets that will enhance value for our shareholders."  

The Moss Mine Project is situated in the historic Oatman Mining district in northwestern Arizona. Since announcing the joint venture project with Northern Vertex in March 2011, the project has completed 59 drill holes through reverse circulation and coring techniques.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Patriot Gold Corp.. (2019, February 18). Patriot Gold Updates on Phase I of Moss Mine Project Drilling Program. AZoMining. Retrieved on November 23, 2024 from https://www.azomining.com/News.aspx?newsID=5175.

  • MLA

    Patriot Gold Corp.. "Patriot Gold Updates on Phase I of Moss Mine Project Drilling Program". AZoMining. 23 November 2024. <https://www.azomining.com/News.aspx?newsID=5175>.

  • Chicago

    Patriot Gold Corp.. "Patriot Gold Updates on Phase I of Moss Mine Project Drilling Program". AZoMining. https://www.azomining.com/News.aspx?newsID=5175. (accessed November 23, 2024).

  • Harvard

    Patriot Gold Corp.. 2019. Patriot Gold Updates on Phase I of Moss Mine Project Drilling Program. AZoMining, viewed 23 November 2024, https://www.azomining.com/News.aspx?newsID=5175.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.