Posted in | News | Gold | Copper

Cobriza Metals Concludes First Phase RC Drilling Program at Arikepay Property

Cobriza Metals has reported that it had completed the phase I reverse circulation (RC) drill program at the Arikepay property on 24 June, 2012. The company has obtained geochemical results for holes from RC-12-ARI-001 to 003.

The company drilled 14 RC holes, totaling 3,630 m at the property. It had drilled five RC holes in the sparsely exposed altered outcrop area, containing strong anomalous rock geochemistry of gold, copper and molybdenum. Cobriza drilled the remaining nine RC holes towards the northwestern and northern part of these five holes in order to examine the lightly exposed altered outcrop extension beneath younger gravel cover. Lesser andesitic volcanic rocks and fine grained to porphyritic intrusive rocks are included in dominant lithologies. It is difficult to determine textures and types of rocks because of extreme alteration.

An arcuate phyllic, propylitic, silicic and lower potassic alteration zone having different intensity trends towards NNW for around 2.2 km. Over half of this alteration zone is present beneath the gravel cover towards the NNW and NW of the popular and sparsely exposed altered outcrop area. Additionally, 11 RC holes out of 13 have moderate to heavy fracture filling and dispersed pyrite mineralization. Mineralization and alteration are exposed towards north and at depth.

The company will consider different options to conduct additional work at the property after analytical results are received from all RC holes. Cobriza collected 5 kg of samples from every RC hole and sent them to Peru-based SGS Laboratories for preparation and examination.

The Arikepay property is accessible by road and lies about 110 km towards the southern part of Arequipa, and is located 45 km towards south of the Cerro Verde mine, containing copper and molybdenum.

Disclaimer: The views expressed here are those of the author expressed in their private capacity and do not necessarily represent the views of AZoM.com Limited T/A AZoNetwork the owner and operator of this website. This disclaimer forms part of the Terms and conditions of use of this website.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Kaur, Kalwinder. (2019, February 18). Cobriza Metals Concludes First Phase RC Drilling Program at Arikepay Property. AZoMining. Retrieved on November 22, 2024 from https://www.azomining.com/News.aspx?newsID=6816.

  • MLA

    Kaur, Kalwinder. "Cobriza Metals Concludes First Phase RC Drilling Program at Arikepay Property". AZoMining. 22 November 2024. <https://www.azomining.com/News.aspx?newsID=6816>.

  • Chicago

    Kaur, Kalwinder. "Cobriza Metals Concludes First Phase RC Drilling Program at Arikepay Property". AZoMining. https://www.azomining.com/News.aspx?newsID=6816. (accessed November 22, 2024).

  • Harvard

    Kaur, Kalwinder. 2019. Cobriza Metals Concludes First Phase RC Drilling Program at Arikepay Property. AZoMining, viewed 22 November 2024, https://www.azomining.com/News.aspx?newsID=6816.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.