Posted in | News | Natural Gas | Oil Shale

Pan Orient Energy to Suspend Jatayu-1 Exploration Well

Pan Orient Energy has announced that the company will suspend the Jatayu-1 exploration well, which is situated onshore Indonesia. This well is cased down to 4.5 in. and has a measured depth of 6,640 ft.

After the casing of well is completed, the company will move the drilling rig to the Geulis-1 exploration site and is expecting to drill this well in about 3 to 4 weeks.

Pan Orient has planned to move a service drill rig to the Jatayu-1 site during this period, and will begin the program to drill about 1,300 ft at the Parigi limestone target with the help of a slim hole drill equipment. It appears that fluid losses for drilling can be potentially reduced by allowing lower mud weights and by placing the over pressured, unstable and gas charged open hole segment in Jatayu-1 well site behind 4.5" casing.

The company needs three weeks to move the slim hole drilling equipment towards the Jatayu-1 well location. The operation may possibly result in considerable cost savings and the present drill rig need not go on standby. Pan Orient intends to complete the Jatayu-1 exploration well to target depth for about $1.5 million USD. This can be potentially achieved without major drilling issues.

Pan Orient is an oil and gas mining and production firm located in Calgary, Alberta. At present, the company is operating in West Canada and onshore Thailand, Indonesia.

Disclaimer: The views expressed here are those of the author expressed in their private capacity and do not necessarily represent the views of AZoM.com Limited T/A AZoNetwork the owner and operator of this website. This disclaimer forms part of the Terms and conditions of use of this website.

G.P. Thomas

Written by

G.P. Thomas

Gary graduated from the University of Manchester with a first-class honours degree in Geochemistry and a Masters in Earth Sciences. After working in the Australian mining industry, Gary decided to hang up his geology boots and turn his hand to writing. When he isn't developing topical and informative content, Gary can usually be found playing his beloved guitar, or watching Aston Villa FC snatch defeat from the jaws of victory.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Dialog Group Berhad. (2019, February 18). Pan Orient Energy to Suspend Jatayu-1 Exploration Well. AZoMining. Retrieved on November 21, 2024 from https://www.azomining.com/News.aspx?newsID=7127.

  • MLA

    Dialog Group Berhad. "Pan Orient Energy to Suspend Jatayu-1 Exploration Well". AZoMining. 21 November 2024. <https://www.azomining.com/News.aspx?newsID=7127>.

  • Chicago

    Dialog Group Berhad. "Pan Orient Energy to Suspend Jatayu-1 Exploration Well". AZoMining. https://www.azomining.com/News.aspx?newsID=7127. (accessed November 21, 2024).

  • Harvard

    Dialog Group Berhad. 2019. Pan Orient Energy to Suspend Jatayu-1 Exploration Well. AZoMining, viewed 21 November 2024, https://www.azomining.com/News.aspx?newsID=7127.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.