Posted in | News | Gold | Mining Business

Crushing Circuit Trade Off Study Completed at Amulsar Gold Project

Lydian International Ltd. ("Lydian" or "the Company"), a gold-focused mineral exploration and development company, today announced that a crushing circuit trade off study has been completed to improve previous design studies carried out in the Feasibility Study (see press release September 7, 2012) and to look at alternative scenario's in which a larger and single crusher scenario may have advantages.

Amulsar is a feasibility level high-sulfidation style, heap-leach gold project with reported CIM compliant Proven and Probable reserves of 2.29M Oz Gold at 0.8 g/t and 9.98M Oz Silver at 3.3 g/t and a resource of 0.2M Oz Gold at 1.0 g/t in Measured and Indicated category and 1.1M Oz Gold at 0.9 g/t in Inferred category.

Lydian has decided to examine an alternative option of utilizing a processing rate of 10 Mtpa from the commencement of operations as the base case production scenario. For this SNC-Lavalin was commissioned to conduct a crushing circuit trade-off study to evaluate the capital cost implications of constructing a single gyratory crusher as opposed to twin jaw crushers installed in phases as modeled in the original feasibility study released in September 2012.

Ten different crushing and screening plant configurations were assessed and compared. The options study examined various sizes and numbers of equipment used in each of the three crushing and associated screening stages. A preferred configuration consisting of one primary gyratory crusher, two secondary double-deck screens, two secondary cone crushers, three tertiary double-deck screens and three tertiary cone crushers was selected.

The advantages of the revised crushing circuit include:

An increased maximum feed size to the primary crusher (gyratory) now 1260mm as opposed to 700mm previously, reducing cost and downtime associated with handling oversize material on the ROM stockpile.

An increase in maximum throughput, now 1800tph as compared to 1565tph which ensures a robust plant with suitable catch up and sprint capability to be able to provide flexibility during the winter weather conditions, making more certain a consistent annual production rate of 10 Mtpa.

Construction and commissioning is completed at the outset of the project with no interruptions in Year 3 of the mine to facilitate installation of the second phase of the crushing circuit, known as the ramp-up period.

A more compact footprint resulting in reduced time and cost associated with foundation preparation for construction.

Estimates completed to feasibility level (+/-15%) including contingency indicate that this crushing circuit will be cost neutral in comparison to that proposed in the feasibility study, while providing increased capacity and significant operational benefits.

Lydian intends to refine this design over the coming months in conjunction with updates to the resource model. Further cost reductions may be achievable once the final crusher location is determined as site civil works including excavation and back fill may not be as intensive as previously envisaged.

The information in this news release was compiled and reviewed by Dr Tim Coughlin, BSc (Geology), MSC (Exploration and Mining), PhD (Structural Geology), FAusIMM; CEO and President of Lydian International Ltd and a qualified person as defined by National Instrument 43-101.

Lydian employees are instructed to follow standard operating and quality assurance procedures intended to ensure that all sampling techniques and sample results meet international reporting standards. Drill core is cut on-site and rock-chips are split to ensure representative sampling. Half core and remaining rock-chips are stored on-site. On-site personnel log and track all samples prior to sealing and shipping. Quality control is monitored by the insertion of blind certified standard reference materials and blanks into each sample shipment. All resource sample shipments are sealed and shipped to ALS Chemex, an independent third party. All assay work for the released results was carried out by ALS Chemex at its analytical laboratory in Rosia Montana, Romania. ALS Chemex's quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025:1999. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples. More information can be found on Lydian's web site.

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Lydian International Ltd.. (2019, February 18). Crushing Circuit Trade Off Study Completed at Amulsar Gold Project. AZoMining. Retrieved on November 21, 2024 from https://www.azomining.com/News.aspx?newsID=7561.

  • MLA

    Lydian International Ltd.. "Crushing Circuit Trade Off Study Completed at Amulsar Gold Project". AZoMining. 21 November 2024. <https://www.azomining.com/News.aspx?newsID=7561>.

  • Chicago

    Lydian International Ltd.. "Crushing Circuit Trade Off Study Completed at Amulsar Gold Project". AZoMining. https://www.azomining.com/News.aspx?newsID=7561. (accessed November 21, 2024).

  • Harvard

    Lydian International Ltd.. 2019. Crushing Circuit Trade Off Study Completed at Amulsar Gold Project. AZoMining, viewed 21 November 2024, https://www.azomining.com/News.aspx?newsID=7561.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.