Posted in | News | Gold | Discoveries

True Gold Announces Step-Out Drilling Results from Karma Gold Project's Nami Deposit

True Gold Mining Inc. is pleased to announce that step-out drilling at the Karma Gold Project's Nami deposit intersected 29.5 g/t gold over 6.0 metres and extended the deposit 250 metres north, along a corridor 150 metres wide.

This previously untested extension has the potential to add an additional 50% to the strike length of the current Nami deposit outlined in the Feasibility Study. The deposit remains open for further expansion.

Holes RMB14RC-115 and RMB14RC-107 each intersected shallow, high-grade, oxidized gold mineralization at depths of less than 60 metres, including:

  • 29.5 g/t Au over 6.0 metres, in RMB14RC-115, including
    • 44.08 g/t Au over 4.0 metres;
  • 0.99 g/t Au over 12.0 metres, in RMB14RC-107.

"We strongly believe that this northern Nami extension will add to the overall resource at Nami in much the same way that North Kao has added to the Kao deposit," stated Scott Heffernan, Vice President, Exploration, of True Gold. "Ongoing exploration results like these continue to support our belief that the resource expansion potential at Karma is exceptional."

Gold mineralization at Nami exhibits the same intrusive-hosted, shallow-dipping structural style found within Kao and North Kao, Karma's two largest gold deposits, where continuity has been demonstrated over strike a length of 1.6 kilometres. North Kao was a blind discovery in 2013 and now has an inferred mineral resource of 1.66 million ounces (47.8 million tonnes at an average grade of 1.08 g/t gold; see March 13, 2014 news release). Like North Kao, the shallow dipping structures found at Nami can be drilled off rapidly for very low costs. Of note, oxide, transition and sulphide mineralization at Nami is all leachable, as per the Feasibility Study.

To review a drill map for the Nami extension, please click on this link:
http://www.truegoldmining.com/sites/default/files/NamiDrillMap1425.pdf

For a full table of recent results related to gold mineralization, please click on this link:
http://www.truegoldmining.com/sites/default/files/NamiDrillResults1425.pdf

RC drilling around the periphery of the Nami deposit was designed to test the strike extents of the dominant structural controls as mapped by a recently completed 20 line-km gradient array IP and magnetic survey. To date, True Gold has completed 2,812 metres in 20 holes in the Nami area as part of the greater 2014 exploration program. True Gold will continue testing this Nami extension along strike.

True Gold's 2014 exploration program was launched in early May and is designed to both expand existing deposits and test new targets. Results from Nami are the first in a series of exploration updates we anticipate providing, as results become available. To date, we have completed approximately two thirds of a planned 15,000 metre combined core and RC drill program. In additional to drilling, 315 line-kilometres of IP and an extensive soil sampling program are also underway.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.