Bannerman Resources Limited is pleased to report further positive results from Phase 3 of the Etango Heap Leach Demonstration Plant Program. The Phase 3 results are similar to or better than the assumptions used in the Etango Definitive Feasibility Study (DFS) and have delivered the clear potential to further reduce operating cost estimates. Phase 3 involved trial leaching of Etango ore in three cribs (2m x 2m x 5m high) and six columns (185mm x 5m high) in a configuration designed to mirror the set-up of a full-scale heap operation.
Pure Gold Mining Inc. ("Pure Gold" or the "Company") is pleased to report results from diamond drilling targeting the McVeigh horizon at the Company's 100% owned Madsen Gold Project ("Madsen"). These holes are part of the ongoing 16,000 metre drill program designed to test and build continuity of high grade gold mineralization in close proximity to the historic mine.
Matamec Explorations inc. ("Matamec" or the "Company") and Canada Strategic Metals ("CSM") are pleased to announce that the La Pointe zone of the Sakami property shows evidence of significant gold potential. The property is optioned by CSM (see below: Option agreement - Sakami Property) and is situated in James Bay (Québec). The La Pointe zone is located in the southern part of the property (See figure 1: Sakami Property Geology).
Unigold Inc. is pleased to announce recent results from exploration drilling at the Candelones Extension deposit, within the Company's 100% owned Neita Concession in the Dominican Republic.
Integra Gold Corp. is pleased to announce a fourth round of assay results from its fall 2015/winter 2016 drill program on the Triangle Deposit on the Lamaque South Gold Project located in Val-d'Or, Québec.
GoldQuest Mining Corp. is pleased to announce an update on the district wide exploration of the Company's 100% owned Tireo Project surrounding their multi-million ounce Romero gold/copper deposit in the Dominican Republic.
Cartier Resources Inc. announces the results of the deep investigation OreVision geophysical survey, completed in January 2016 on the MacCormack Property, situated 25 km north-north-west of the Bousquet - LaRonde mining camp infrastructures. The results generated two (2) drill target zones.
Oban Mining Corporation ("Oban" or the "Corporation") is pleased to announce new results from the ongoing drill program at its 100% owned Windfall Lake gold project located in Urban Barry Township, Québec. The ongoing 55,000 metre drill program combines definition drilling above the Red Dog intrusion ("Red Dog") and expansion drilling above and below Red Dog.
Marathon Gold Corporation ("Marathon" or the "Company") today announced positive results from the winter 2016 drilling southwest from the Marathon Deposit, Valentine Gold Camp. The latest drill program consisted of 13 widely spaced step-out drill holes targeting mineralization underneath boggy areas of the property that are not amenable to drilling outside the winter.
Avnel Gold Mining Limited ("Avnel" or the "Company") is pleased to announce results from a definitive feasibility study for its Kalana Main Project in south-western Mali with an effective date of March 1, 2016 (the "DFS"). The Company is reporting a maiden Mineral Reserve of 1.96 million ounces of gold and an updated Measured plus Indicated Mineral Resource estimate of 3.06 million ounces of gold for the Kalana Main project.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.