Posted in | News | Gold | Mining Business

Cardinal Resources Announces Interim Metallurgical Test Results for Namdini Gold Project

Cardinal Resources Limited is pleased to announce interim results for Phase Two of its metallurgical test programme for the Namdini Gold Project.

HIGHLIGHTS

  • Utilizing standard gold recovery techniques has demonstrated an overall increased gold recovery rate of 86%,
  • A conventional grind‐flotation‐regrind‐CIL flowsheet continues to be the preferred process option

Cardinal's Project Manager, Bruce Lilford said:

"We are extremely pleased with the interim results as they continue to improve overall recoveries for Namdini. The test results thus far are demonstrating good lithological consistency, which will allow for predictable metallurgical performance in a production scenario.

Our Phase Two metallurgical test programme is focused on determining resource variability for our main lithology domains being metavolcanics, granite and diorite. The test programme was developed to enhance our metallurgical understanding in order to help ensure a robust process design.

Cardinal selected 16 separate life of mine drill holes as representative samples from the three main lithologies across the entire deposit. Each of the five metre downhole sample lengths were then composited by lithology for metallurgical testing.

The geostatistical resource model was used to target the average grade of the combined sample for each lithology, based on a notional cut-off grade of 0.4 g/t Au ("grams per tonne gold"). The intervals were selected to ensure that the following criteria were met:

  • representative spatial distribution within the overall Namdini gold deposit,
  • a range of gold grades, predicted to be encountered during normal mining operations, and
  • average gold grades matching the overall Namdini geostatistical resource model above a 0.4 g/t Au cut-off

In addition to the drill holes noted above, the Company is conducting additional tests for the anticipated starter pit area. This supplemental metallurgical testing is still in progress.

As the metallurgical testing advances in the project development phase, the process flowsheet will continue to be optimized in order to provide the necessary detailed design criteria."

Cardinal's CEO / MD, Archie Koimtsidis said:

"This round of interim metallurgical results has clearly demonstrated good opportunity for higher gold recovery. We anticipate further confidence and improvement in overall gold recoveries as we continue our metallurgical test programmes."

Qualified Person - Competent Person's Statement

Scientific and technical information contained in this press release has been reviewed and approved by Marc LeVier, K. Marc LeVier & Associates, Inc., who is a 'qualified person' as defined by National Instrument 43-101- Standards of Disclosure for Mineral Projects ("NI43-101"). Mr. LeVier holds a Qualified Professional status from the Mining and Metallurgical Society of America.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.