Crazy Horse Resources has reported drilling results from the nineteenth to twenty third holes of the feasibility program at Taysan copper-gold-silver porphyry project.
The company has cut 0.46% copper, 0.15 g/t gold and 1.7 g/t silver over 349.6m in CZT021, 0.25% copper, 0.08 g/t gold, 0.6 g/t silver over 580m in CZT022. The deposit stays open and will continue drilling with six diamond drill rigs.
The assay results from CZT022 on section 19100N have continued to verify depth of the ore body to 646m down hole. Similarly, results from CZT021 on section 19460N have expanded the ore body from 324m to 352m and confirms the presence of deeper ore zone below the recent known ore from 382m to 398.7m. Also, the high-grade zones in CZT021 and CZT022 will assist to locate the >0.3% Cu wireframe models.
Drilling results from CZT020 on section 19760N verify the near surface ore body and expand the famous ore body. The extension of the near surface ore body is 31.5m from 86.5 to 118m and that of the deep ore body is 82m from 338m to 420m. Also, CZT020 results extend the ore body from 187m to 230m, which unites the two deeper ore zones.
The current encouraging results therefore validate the Taysan deposit as the consistent, conventional and growing deposit. Quest Exploration Drilling conducts drilling using a triple tube diamond drilling system and Edson 3000 and LF70 drill rigs.