Golden Predator has declared the results of 14 diamond holes drilled additionally. The drilling program at Bohemian-Schooner Zone was finished in 2011. The Bohemian-Schooner Zone of the Brewery Creek Project is situated close to Dawson City in Yukon.
Considerable results were obtained from holes BC11-346 and BC11-352. In hole BC11-346, 1.47 g/t gold was obtained at a depth of 56.0 m with an interval of 24.0 m, 3.54 g/t gold obtained when 7.5 m interval included. In hole BC11-352, 0.96 g/t gold was obtained at 80.8 m depth with 28.7 m interval.
The highly mineralized Bohemian-Schooner Zone has a steep corridor striking east to northeast. In the highly modified quartz monzonite ridges, the corridor crosses over a low-angle mineralization zone. The Zone extends up to 1 km and is situated 500 m close to the Lucky deposit.
A gold mineralization of 1.90 g/t was observed in the hole BC11-378 including; however, it did not fulfill the required conditions. No considerable mineralization was observed from holes BC11-381, BC11-379, BC11-377 and BC11-372.
In 2011, the company has finished drilling of about 55,453 m in the Brewery Creek project. Delineation was focused on three regions discovered in 2011 which includes Classic, Sleeman and Bohemian-Schooner Zones, the East and West Big Rock Zones and North Slope were drilled additionally.
Drilling will be extended in the Bohemian- Schooner, Sleeman and Classic Zones this year. Other targets identified through geophysical and geochemical surveys will also be explored.