Vantex Resources has encountered a drill intersection at the Moriss showing’s northern zone. It has intersected 7.79 g/t gold over 6 m, including 8.84 g/t gold over 1.5 m in this same drill hole.
The company has drilled this hole to validate this gold zone’s dip that was cut by the drill holes VPE10-11, which returned 14.63 g/t gold over 6 m, 9.06 g/t gold over 5.5 m and 8.12 g/t gold over 24 m, and VPE10-18, intersected 7.97 g/t gold over 9 m. Based on the analysis, it appears to dip towards the south. This structure has been cut by the drill hole VPE11-41 at a deeper level. The assays are pending.
Vantex has drilled 10 holes at the Moriss showing, in which six holes were drilled towards the north to examine the north zone’s lateral expansion. Three holes were drilled to the Moriss zone’s southwest direction to assess the formerly intersected gold zones.
No considerable values were intersected in the drill hole VPE11-38. The company has cut 1.17 g/t gold over 8.10 m in the drill hole VPE11-39. The drill holes VPE10-19 and VPE10-19 formerly intersected this zone. Vantex has encountered 3.52 g/t gold over 9 m in the drill holes VPE10-19 and 1.37 g/t gold over 5.20 m in the hole VPE11-24. three gold zones were found in the drill hole VPE11-40, grading 3.49 g/t gold over 1.10 m, 48.91 g/t gold over 1.50 m and 2.28 g/t gold over 1.30 m. Low grades are hosted in the southern region when compared to the North and Moriss zones, but this south area has confirmed the occurrence of a significant gold in good geological surroundings.