Posted in | News | Gold

Vanstar Receives Quebec Ministry Permit for 124 Additional Drill Holes on the Liam Showing

The management of Vanstar Mining Resources Inc. (the « Company ») announces that it has obtained from the Quebec Ministry of Natural Resources its permit for 124 additional drill holes on the Liam showing, that was recently discovered in November 2013 (see November 26 and December 18 press releases).

Drilling is planned to start around mid January, depending on the weather. Holes will be drilled 50 metres apart and will assess the Liam showing extensions along strike and at depth.

The Company also acquired by map designation 35 additional mining cells and has acquired from a group of independent prospectors, a 100 % interest in 23 additional cells in exchange of 350,000 common shares of the Company. These new cells cover an area of approximately 3,248 hectares.

No royalties were granted to the sellers. These agreements are subject to the approval of the TSX Venture exchange.

The new cells are located on the west and south boundaries of the Nelligan project.

The Liam showing

The Liam gold showing was discovered in November 2013 with drill hole NE13-04 (See November 26, 2013 press release). This hole was testing a low magnetic anomaly recognized on a length of more than 900 metres. This important gold structure was intersected at shallow depths and could result in an open pit exploitation.

The Liam gold zone lies within an intensive deformation corridor which is interpreted to coincide with a NE-SW low mag anomaly. Hosted in a meta-sedimentary environment, the core of the zone is strongly silicified with 1-2% disseminated pyrite over 20 meters of core length. A sericite-fuschite schist unit along with a sheared and mineralized Iron Formation are observed along the south contact. A horizon of amphibolite hosting 5-10% silicified and mineralized veinlets, with traces of molybdenum, is observed along the north contact. Following a second inspection of the drill cores, visible gold was observed in two of the four drill holes so far completed on this showing.

Nelligan Project

The 100% owned Nelligan property now consists of 98 cells covering an area of 5,488 hectares. It is located approximately 45 kilometers south of the village of Chapais and is accessible year round by several forestry roads. A power line crosses the area some 4 kilometers to the east of the project. No constraints such as protected parks or ecological reserve limit mining exploration on the property.

The Nelligan property is located 15 km SSE of Tomagold's Monster Lake project where Iamgold Corp. recently agreed to exploration work commitments of $16,000,000 over a period of 5 years.

In the same area, you can also find the Philibert (Soquem), Meston Lake and Joe Mann deposits. The Chevriers deposits and the Murgor showings are located north-east of the Nelligan project.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.